Project History

2012 — 21 ‘000 t 2013 — 642 ‘000 t 2014 — 891 ‘000 t 2015 — 1,135 ‘000 t 2016 — 1,142 ‘000 t 2017 — 1,167 ‘000 t 2018 — 1,214 ‘000 t 2019 — 1,084 ‘000 t

In 2006, Acron Group member NWPC obtained licences to develop the apatite-nepheline ore deposit at the Oleniy Ruchey field in Murmansk region. This project will complete Acron Group’s vertical integration by creating a potash raw material base for complex fertiliser production.

Oleniy Ruchey Deposit Key Parameters

Administrative area Kirovsk
Catchment basin Umba River
Coordinates 67º 41’ North, 34º 12’ East
Subsoil user NWPC
Geological industrial deposit type Magmatic
Ore type Apatite-nepheline ore in ijolite-urtit
2017–2023

2017–2023

Developing the underground mine and gradually increasing output to 2 mtpa of apatite concentrate

Read more
2012–2017

2012–2017

Developing the open pit and building the underground mine, increasing the mine capacity, building a railway line from the production site to Titan railway station.

Read more
2008–2012

2008–2012

Building mining and processing facilities, an open pit, and infrastructure. Apatite concentrate production was launched in late 2012.

Read more
2005–2008

2005–2008

Preparing design documents for the Oleniy Ruchey mine and obtaining approval from the state expert review board

Read more
Мы используем cookies

Нажимая «Хорошо», вы соглашаетесь с использованием нами инструментов аналитики и организации поддержки

Хорошо